Our Projects

Geological Exploration Programme
ur ongoing exploration programme surveys Dasuo Mining Ghana’s licensed concessions for viable gold deposits. Using geochemical sampling, geophysical survey techniques, and detailed geological mapping, we are building a precise picture of the resource potential across our 5 licensed hectares feeding directly into our extraction planning pipeline.
Rigorous surveying today means responsible, well-planned extraction tomorrow.

Open-Pit Gold Extraction
Our primary open-pit extraction operation is currently active on licensed land in Ghana. The site runs under full Minerals Commission approval and Ghana EPA compliance, with continuous environmental and safety monitoring in place. A significant share of our site workforce is drawn directly from surrounding communities, keeping the economic benefit of our operations local.
Every tonne extracted under strict safety standards, with community employment at its heart.

On-Site Processing & Gold Recovery Facility
Our processing facility receives ore directly from our extraction operations and takes it through crushing, milling, gravity concentration, and gold recovery entirely in-house. Operating on-site eliminates third-party handling risk, maintains full chain-of-custody integrity, and ensures consistent output quality from ore to refined gold at every stage of production.
From the ground to refined gold transparent, traceable, and accountable throughout.

Land Reclamation Phase One Complete
The first phase of our land reclamation programme has been successfully completed on a previously extracted section of our licensed concession. Topsoil has been replaced and graded, native Ghanaian vegetation has been replanted, water drainage has been restored, and the land has been returned to a condition suitable for community agricultural use. Ongoing monitoring is reported quarterly.
